Will County Land Use Department
Land Use Home
Map to the Land Use Department
Current Agendas
Links to Other Web Sites
Contact Us
Request for Records

Disclaimer

This web site has a number of downloads available in the Adobe Acrobat Reader (PDF) format.  Click on the logo below to download the Reader software directly from the Acrobat website.

2030 Transportation Framework Plan

The 2030 Transportation Framework Plan was adopted by the Will County Board on April 16, 2009.  This document presents the latest renewal of the Will County Transportation Plan.  This update builds from and amplifies previously developed transportation plans and studies. 

This plan reflects a collaborative effort among municipalities, townships, regional agencies, and the State of Illinois. The Year 2030 Regional Transportation Plan, being managed by the Chicago Metropolitan Agency for Planning, has been used as a framework for the current Will County plan. It is based on the same year 2020 population and employment forecasts. The Illinois Department of Transportation (IDOT), Metropolitan Rail (Metra), Pace suburban bus service, and the Regional Transportation Authority (RTA) provided assistance and direction during the planning process. The county also asked each municipality, township, and state agency to participate. Each agency was asked for input and guidance throughout the process.

Section Title (right click to Save As) Pages File Size
Preliminaries

Table of Contents

10 0.63Mb
1 Introduction 12 2.89Mb
2 Plan Goals & Objectives 5 0.21Mb
3 Plan Assumptions & Previous Studies 13 0.32Mb
4 Transportation System Guidelines & Policies 13 0.35Mb
5

Existing Transportation Facilities & System Performance 

29 3.41Mb
6

2030 Travel Forecast & Future System Performance

21 2.91Mb
7 Plan Development Methodology 22 1.80Mb
8 Financing Transportation Improvements 16 0.53Mb
9 2030 Recommended Transportation Plan 41 3.88Mb
10 Plan Implementation & Ongoing Management 8 0.21Mb
Appendix A Prioritization Ratings & Rankings 49 0.47Mb
Appendix B Model Output for 2004 (Existing Year) 6 0.09Mb
Appendix C

Model Output for 2030 (Existing plus Committed Network)

6 0.09Mb
Appendix D Model Output for 2030 Unconstrained Plan 6 0.09Mb
Appendix E Model Output for 2030 Constrained Plan 6 0.09Mb
Appendix F Public Involvement 83 1.94Mb

 

last modified: 05/19/2010

Hit Counter   for FY2010